All tenders
PublicOpenAB-2026-06746Canada· Tender

Smoky Lake County - Request for Proposal - HWY 28/63 Regional Water Commission Pipeline Condition Assessment and Renewal Prioritization Study

Sign in to view the buyer

The buyer and the original notice are hidden. Create a free account to unlock them.Create free account
Estimated value
Not disclosed
Earliest action required
Checking…
Bid closes
21 Oct 2026
Submission method
Not stated at source

Ca Alberta Apc · published 07 Oct 2026 · last checked 08 Oct 2026 · no amendments recorded

Scope of works

The Highway 28/63 Regional Water Services Commission invites proposals from qualified consultants to complete a Regional Water Pipeline Condition Assessment and Renewal Prioritization Study. The Commission’s regional system includes more than 200 kilometres of waterlines and associated infrastructure. The study will assess infrastructure condition, performance and risk and establish a prioritized 25-year capital renewal plan to support reliable water service, long-term financial planning and future funding applications. The scope includes: 1) Reviewing available drawings, asset records, operating information, maintenance records, leak history and hydraulic information. 2) Developing an editable GIS inventory for pipelines and related linear assets and an Excel register for facilities, pumps, mechanical equipment, electrical systems, instrumentation, controls and structural components. 3) Conducting visual condition assessments of accessible infrastructure and identifying immediate concerns, urgent repairs and information gaps. 4) Assessing asset criticality, likelihood and consequences of failure, remaining useful life and renewal priorities. 5) Preparing planning-level replacement cost estimates and forecasts for repair, rehabilitation, replacement and other identified improvements. 6) Developing unconstrained and prioritized 25-year investment forecasts that consider risk, available funding and other capital needs. - Facilitating workshops with Commission representatives to review risk criteria, findings and investment priorities. - Preparing a draft report, presenting findings and delivering a final report with editable inventories, supporting calculations and investment forecasts. The base scope consists of records review, visual inspections and planning-level analysis. Additional testing, detailed hydraulic modelling, detailed engineering design and construction services must be identified and priced separately if proposed. Proponents should demonstrate relevant experience with regional potable water systems, infrastructure condition assessments, GIS asset inventories, risk analysis and capital renewal planning. Proposals must include the proposed methodology, project team, relevant experience, schedule, detailed fees, assumptions and exclusions. The anticipated project duration is approximately six months from authorization to proceed. Refer to the RFP document for submission instructions, closing details, evaluation criteria and complete requirements.

Published attachments (1)

Full bid documents are not available online. The attachment below is the tender notice only — see the participation requirements above for how to obtain the complete bid pack.

Type
Request for proposal
Tender
Sector
Electrical Equipment & Power Systems
Procedure
LIMITED
Classification
81100000

Key dates

  1. Published at source07 Oct 2026
  2. Submission deadline21 Oct 2026