Scope of works
Kishorn Port Limited (KPL) own and operate the drydock facility at Kishorn. The existing drydock has been enlarged with the rock material blasted and removed to reclaim 8.5 hectares of foreshore land to the east of the drydock. The contractor will construct a new 150m long quay at the newly formed reclamation area with -12m CD water depth. In support of its ongoing operations, KPL is engaging in market research with a view to launching a competitive tender process for works associated with the Phase 1B - East Quay Development at a later date for the award of a contract.
Published attachments (1)
Full bid documents are not available online. The attachment below is the tender notice only — see the participation requirements above for how to obtain the complete bid pack.
- Other attachment — 093459 2026Not the complete bid packOpen other attachment
- Type
- Invitation to bid / open tender
- Tender
- Sector
- Construction & Infrastructure
- Procedure
- Restricted procedure
- Classification
- 45241000
- Original notice
- Sign in to open the original notice
