Scope of works
Diversion of an existing UK Power Networks 11kV electricity cable affected by the BM29 Bell Mouth construction works at Stifford Clays Road. The works include management of the 11kV outage, CDM site setup, excavation and reinstatement of approximately 130m of cable duct route, installation of approximately 130m of 11kV 185Al XLPE cable, excavation and reinstatement of two joint bays, installation of two straight joints, traffic management and associated network reconnection works.
Published attachments (1)
Full bid documents are not available online. The attachment below is the tender notice only — see the participation requirements above for how to obtain the complete bid pack.
- Other attachment — 093309 2026Not the complete bid packOpen other attachment
- Type
- Contract award
- Contract Award
- Sector
- Electrical Equipment & Power Systems
- Procedure
- Below threshold - without competition
- Classification
- Not published at source
- Original notice
- Sign in to open the original notice