Scope of works
This procurement covers the design, manufacture, fabrication, providing, supplying and delivery of two pumps and pre-cast concrete units (PCCU) that form the pump sump, support and inlet structure for the new pumping station for the North Wootton pumping station replacement project. The value is estimated at circa £390,000 total. These figures are exclusive of VAT. The pumps will have high efficiency, low maintenance requirements and will deliver a broad range of flow rates at their design heads. The pumps will provide safe passage for eels and fish and deliver a Best Achievable Eel Protection (BAEP) solution that reduces the killing and injury of fish, improving downstream passage. The requirement is: The design, manufacture, fabrication, providing, supplying and delivery of pumps for North Wootton pumping station. This includes Design, Testing and providing the required information for the Health and Safety File and Operations and Maintenance Manual. The Water Management Alliance (WMA) will oversee this procurement on behalf of the King’s Lynn Internal Drainage Board working with Turner & Townsend as advisors.
- Type
- Invitation to bid / open tender
- Tender
- Sector
- Healthcare & Medical
- Procedure
- Competitive flexible procedure
- Classification
- Not published at source
- Original notice
- Sign in to open the original notice
