PublicAwardedocds-h6vhtk-06faf7United Kingdom· Contract Award

GL1 Leisure Centre Contract 2 and Stage 3 Design

Sign in to view the buyer

The buyer and the original notice are hidden. Create a free account to unlock them.Create free account
Estimated value
Not disclosed
Earliest action required
Checking…
Bid closes
Submission method
Not stated at source

Uk Fts · published 16 Sept 2026 · last checked 16 Sept 2026 · no amendments recorded

Scope of works

See attached contract for details. Progressing Design from RIBA Stage 3 to RIBA Stage 4 1.1. Appoint and lead the Design Team a) Employ Design Consultants: Engage key consultants such as architects, structural engineers, MEP engineers, and other necessary specialists to complete the Technical Design, for manufacturing and construction stage (RIBA 4). b) Design Coordination: Lead design workshops and meetings to ensure integrated design solutions across disciplines. c) Design Management: Manage the design process, ensuring all parties adhere to the design brief, project scope, and cost parameters. d) Review and Sign-off: Regularly review design progress with the Project Manager and ensure all design outputs meet project requirements before sign-off at the end of RIBA Stage 4. 1.2. Technical Design Development a) Technical Design Development: Progress the design to RIBA Stage 4, including detailed specifications, construction details, and schedules for all building elements. b) Value Engineering: Collaborate with the design team and Employer to refine the design, ensuring it aligns with budget constraints while meeting quality and performance standards. c) Building Control: Ensure designs are co-ordinated and with Building Control requirements. Ensure that the design complies with Building Regulations and engage with Building Control as needed to obtain all necessary approvals. 1.3. Design Input a) Providing advice on requirements for off-site design, temporary works and manufactured components. b) Providing advice on all aspects of "buildability" in relation to the proposed design and on the feasibility of construction interfaces and tolerances and suggesting any construction changes which could be used to reduce the incidence of conflicts or difficult interfaces between different elements of a single package of work or between different packages of work. c) Through the design development process, developing a "Contractor's Proposals" document that satisfies the Employer's Requirements for agreement with the Employer to be included in the Main Contract. 2. Supply Chain Engagement and Tendering 2.1 . Pre-tender Engagement with Supply Chain a) Market Engagement: Identify and engage potential subcontractors and suppliers early in the process to gather feedback on design feasibility, material availability, and buildability. b) Package Scoping: Define and scope work packages for the supply chain based on the developed RIBA Stage 4 design. 2.2 . Open Book Tender Process a) Prepare Supply Chain Package Tender Documentation: Compile and issue tender documents, including drawings, specifications and schedules of work. b) Tender Management: Facilitate an open book tender process for supply chain packages, ensuring transparency in pricing and compliance with the project's requirements. c) Bid Evaluation: Evaluate tenders with the Project Manager, Cost Manager, design team and Employer, conducting thorough assessments of cost, quality, and programme implications. d) Negotiations and Recommendations: Lead negotiations with suppliers and subcontractors, providing recommendations for appointment based on best value.

Type
Contract award
Contract Award
Sector
Railways & Rolling Stock
Procedure
Below threshold - limited competition
Classification
Not published at source

Key dates

  1. Published at source16 Sept 2026
  2. Submission deadline