All tenders
PublicAwardedocds-h6vhtk-06d948United Kingdom· Contract Award

DfI TRAM T-1172 A4 Annaghilla Road Carriageway Resurfacing

Sign in to view the buyer

The buyer and the original notice are hidden. Create a free account to unlock them.Create free account
Estimated value
Not disclosed
Earliest action required
Checking…
Bid closes
Submission method
Not stated at source

Uk Fts · published 18 Sept 2026 · last checked 18 Sept 2026 · 25 amendments recorded

Scope of works

Delivery of a carriageway resurfacing scheme on a 4.35km section of the A4 Annaghilla Road, between Ballygawley and Augher. The scheme comprises the milling and removal of the existing surface course and binder course with the construction of a new Hot Rolled Asphalt (HRA) surface course. Existing carriageway levels and profiles are to be maintained throughout the works. The extent of the works is generally confined to the existing carriageway footprint. The works may also include regulation of existing pavement layers and/or localised replacement of the binder course where identified within the contract documents. The objective of the project is to restore the structural and functional condition of the carriageway through the replacement of the existing deteriorated surfacing while maintaining the existing road geometry and levels. The successful Contractor will be required to undertake all construction activities necessary to complete the resurfacing works, including traffic management, milling, pavement repairs, surfacing operations, iron work reinstatement, road markings, associated ancillary works and all testing and quality assurance requirements specified within the contract documentation. The contract will be delivered under the NEC4 Engineering and Construction Contract (ECC) Option B. Scope of Works includes the following: A. Provision and maintenance of traffic management arrangements. B. Milling and removal of the existing surface course and binder course layers C. Regulation and/or localised binder course replacement as detailed in the contract documents. D. Laying of new Hot Rolled Asphalt (HRA) surfacing and binder course. E. Reinstatement and adjustment of iron work. F. Reinstatement of road markings and other affected highway features. G. Completion of all associated testing, quality assurance and health and safety requirements.

Type
Contract award
Contract Award
Sector
Healthcare & Medical
Procedure
Below threshold - open competition
Classification
Not published at source

Source provenance (2)

Every portal notice that contributed to this record, with the values each one published. Where portals disagree, the originating notice is the published record.

Portal / referenceBuyerPublishedDeadlineValueMatch
uk_fts
ocds-h6vhtk-06d948
Sign in to view the buyer18 Sept 2026Published record
uk_fts
ocds-h6vhtk-06d948
Sign in to view the buyer25 Aug 202609 Sept 2026GBP 1,735,000Published record

Update history (25)

Field-level amendments detected by TenderHive monitoring at each harvest of the source portal.

  1. uk_fts7 fields changed
    • Scope of works

      Delivery of a carriageway resurfacing scheme on a 4.35km section of the A4 Annaghilla Road, between Ballygawley and Augher. The scheme comprises the milling and removal of the existing surface course and binder course wi…

      Delivery of a carriageway resurfacing scheme on a 4.35km section of the A4 Annaghilla Road, between Ballygawley and Augher. The scheme comprises the milling and removal of the existing surface course and binder course wi…

    • Submission deadline

      09 Sept 2026

    • Status

      closed

      awarded

    • Estimated value

      1735000

    • Currency

      GBP

    • Notice type

      tender

      contract_award

    • Source notice URL

      https://www.find-tender.service.gov.uk/Notice/081018-2026

      https://www.find-tender.service.gov.uk/notice/088747-2026

  2. uk_fts0 fields changed
    • uk_fts0 fields changed
      • uk_fts0 fields changed
        • uk_fts0 fields changed
          • uk_fts0 fields changed
            • uk_fts0 fields changed
              • uk_fts0 fields changed
                • uk_fts0 fields changed
                  • uk_fts0 fields changed
                    • uk_fts0 fields changed
                      • uk_fts0 fields changed
                        • uk_fts0 fields changed
                          • uk_fts0 fields changed
                            • uk_fts0 fields changed
                              • uk_fts0 fields changed
                                • uk_fts0 fields changed
                                  • uk_fts0 fields changed
                                    • uk_fts0 fields changed
                                      • uk_fts0 fields changed
                                        • uk_fts0 fields changed
                                          • uk_fts0 fields changed
                                            • uk_fts0 fields changed
                                              • uk_fts0 fields changed
                                                • uk_fts0 fields changed

                                                  Key dates

                                                  1. Published at source18 Sept 2026
                                                  2. Submission deadline