Design for Longevity- Electrolyser Prototype Design

Sign in to view the buyer

The buyer and the original notice are hidden. Create a free account to unlock them.Create free account
Estimated value
Not disclosed
Earliest action required
Checking…
Bid closes
Submission method
Not stated at source

Uk Fts · published 15 Sept 2026 · last checked 15 Sept 2026 · no amendments recorded

Scope of works

The STEP Fuel Cycle is the subsystem responsible for recovering, purifying and supplying tritium to the STEP fusion reactor. Tritium is present in a variety of forms, phases and compositions, including tritiated water. Vapour-phase electrolysis techniques such as solid-oxide electrolysis have been identified as a suitable technique for processing small quantities of tritiated water. The scope is to deliver the conceptual design of an electrolyser system (electrochemical cell or stack). This includes, but is not limited to, components of the electrolyser: electrolytes, electrodes, interconnects, separators, electrical connections, vessels, structural components, seals, gaskets, heating elements, inlet/outlet pipes, ports, flanges and instrumentation. The scope does not include conceptual design of ‘Balance of Plant’ equipment such as power supplies, pumps, purification stages, boilers, compressors or dehumidifiers. However, the impact on balance of plant equipment must be considered in design decisions for the electrolyser itself. The scope is structured into three sequential phases with interim milestones. These phases will progressively develop technical understanding, validate assumptions, and converge on agreed technical content.

Type
Contract award
Contract Award
Sector
Electrical Equipment & Power Systems
Procedure
Below threshold - open competition
Classification
Not published at source

Key dates

  1. Published at source15 Sept 2026
  2. Submission deadline