Scope of works
The University is the single occupier of the Allerton Building. The building houses professional services, teaching spaces and a canteen on the ground floor. The building is located centrally on the Frederick Road Campus. The proposed works will take place on the 2nd floor roof area and within the ALS202 study space directly below. The existing Air Handling Unit (AHU) and associated equipment have reached the end of their serviceable life and are therefore scheduled for replacement. The current unit is situated on the 2nd floor roof area of the Allerton Building and provides ventilation to the ALS202 study space below. The existing AHU is currently supported on a timber support plinth, which is damaged and showing signs of deterioration. As part of the proposed works, this will be removed and the roof covering reinstated. The new system will be supported on a steel platform, which will be installed as part of the works.
Published attachments (1)
Full bid documents are not available online. The attachment below is the tender notice only — see the participation requirements above for how to obtain the complete bid pack.
- Other attachment — 092043 2026Not the complete bid packOpen other attachment
- Type
- Contract award
- Contract Award
- Sector
- Civil Works & Roads
- Procedure
- Below threshold - award under framework
- Classification
- Not published at source
- Original notice
- Sign in to open the original notice