Scope of works
The Industrial Emissions Directive (IED) sampling requirement is part of an improvement programme outlined within the newly issued permits to characterise any liquors returning to the head of a wastewater treatment works. It requires a large suite of determinands (170) to be analysed including freshwater specific pollutants and priority hazardous substances and Best Available Techniques (BAT) conclusions (6 and 7). This is enforced and regulated by the Environment Agency (EA). UU require 2 suppliers for the collection of samples at 9 IED sites to then be transported in refrigerated vehicles for analysis at certified laboratories for Industrial Emissions Directive (IED) permit requirements. Upon collection of the samples, the results should be returned to the laboratory within 10 working days.
- Type
- Contract award
- Contract Award
- Sector
- Architectural & Engineering Services
- Procedure
- Negotiated procedure with prior call for competition
- Classification
- 71900000
- Original notice
- Sign in to open the original notice
