Scope of works
The requirements are structured as follows. • Lot 1 Straight Track Stairlifts. • Lot 2 Curved Track Stairlifts. • Lot 3 Through Floor Lifts. • Lot 4 Ceiling Tracking Hoists. • Lot 5 Automatic WCs. • Lot 6 Prefabricated Ramps.
- Type
- Other notice
- Tender
- Sector
- Other / Unclassified
- Procedure
- Not published at source
- Classification
- Not published at source
- Original notice
- Sign in to open the original notice
