Scope of works
Milton Keynes City Council (the ‘Authority’) contract for the provision of the operation and maintenance of Milton Keynes Waste Recovery Park (MKWRP) (the ‘Contract’).The MKWRP is an innovative, operational residual waste recovery facility comprising three adjoined and interlinked technologies: mechanical treatment, dry anaerobic digestion and advance thermal treatment, capable of processing up to 132,000 tonnes per year and providing critical infrastructure to deliver the Authority’s statutory waste disposal functions.The service requires the appointed contractor to work in partnership and collaboration with the Authority to optimise the capacity, efficiency and overall performance of the MKWRP to achieve a design life up to at least 2042.
Published attachments (1)
Full bid documents are not available online. The attachment below is the tender notice only — see the participation requirements above for how to obtain the complete bid pack.
- Other attachment — 093419 2026Not the complete bid packOpen other attachment
- Type
- Contract award
- Contract Award
- Sector
- Environment & Climate
- Procedure
- Competitive dialogue
- Classification
- 90500000
- Original notice
- Sign in to open the original notice
