Scope of works
Gedling Borough Council appointed Alliance Leisure Services Ltd through the UK Leisure Framework to deliver the Carlton Active project. As part of the approved Leisure Transformation Programme, a two-phase enabling works package was commissioned to facilitate redevelopment of the Richard Herrod Centre site. The Phase 2 Demolition contract incorporates the demolition of the Richard Herrod Centre and associated site preparation works required to create a development-ready site for the future Carlton Active facility. Delivery of Phase 2 Enabling Works comprising: • Demolition of the Richard Herrod Centre. • Removal of associated slabs and foundations. • Site clearance and preparation works. • Demolition of existing bowls club structures. • Temporary site infrastructure and security arrangements. • Utility disconnections and enabling infrastructure works. • Associated project management and delivery services through the UK Leisure Framework.
Published attachments (1)
Full bid documents are not available online. The attachment below is the tender notice only — see the participation requirements above for how to obtain the complete bid pack.
- Other attachment — 28d53d93 175f 4358 Af16 0d514bff9966 912416Not the complete bid packOpen other attachment
- Type
- Contract award
- Contract Award
- Sector
- Construction & Infrastructure
- Procedure
- Call-off from a framework agreement
- Classification
- 45111100
- Original notice
- Sign in to open the original notice