All tenders
PublicOpenLot LOT-1WB-OP00463835Guyana· Tender

Improvement (Rehabilitation and Upgrade) of the Selected Regional Road Corridor -Reconstruction of Existing Road Network on the East Coast Demerara – Lot 1: Mahaica Bridge to Abary Bridge Road Corridor (Km. 0+00 – Km. 27+10)

Sign in to view the buyer

The buyer and the original notice are hidden. Create a free account to unlock them.Create free account
Estimated value
Not disclosed
Earliest action required
Checking…
Bid closes
02 Oct 2026
Submission method
Not stated at source

World Bank Procurement · published 21 Aug 2026 · last checked 21 Aug 2026 · 25 amendments recorded

Scope of works

Project P501759 — Integrated Transport Corridors Project · Method: Request for Bids · Civil works · SPECIFIC PROCUREMENT NOTICE (PROCUREMENT OF GOODS/WORKS) Request for Bids Works (Two-envelope Bidding Process Without Prequalification) Employer: The Co-operative Republic of Guyana Project: Integrated Transport Corridors Project (ITCP) Contract Title: Rehabilitation and Upgrade of Mahaica Bridge to Abary Bridge Road Corridor Country: The Co-operative Republic of Guyana Credit No.: IDA-77040/ IDA-77050/ IDA-77060 RFB No: P501759-CW-1 Issued on: August 20, 2026 The Co-operative Republic of Guyana has received financing from the World Bank toward the cost of the Integrated Transport Corridors Project (ITCP) and intends to apply part of the proceeds toward payments under the contract for the Improvement (Rehabilitation and Upgrade) of the Selected Regional Road Corridor -Reconstruction of Existing Road Network on the East Coast Demerara – Lot 1: Mahaica Bridge to Abary Bridge Road Corridor (Km. 0+00 – Km. 27+10) . The Ministry of Public Works now invites sealed Bids from eligible Applicants/Bidders for the construction of 27.1 kilometers of asphalt concrete road, along the Upper East Coast Demerara corridor in Guyana, extending from Mahaica River Bridge to Abary River Bridge. The works comprise a dual carriageway facility consisting of two lanes in each direction, separated carriageways, and paved shoulders 1.0 m to 1.5 m wide. The works include, but are not limited to, the improvement (rehabilitation and upgrade) of approx. 27 km of roadway. The Works includes for the relocation of existing utilities from within the Works limit, the construction of 10 No. 10-15m span prestressed precast concrete bridges, 750m precast box culverts, 20,120m in-stu concrete drains, 17,040m earthen drains, the installation of road furniture and traffic safety facilities as part of Road Safety improvements, and other ancillary works as specified in the Contract Documents. The Contract is expected to be completed within a period of 36 calendar months from the Commencement Date. Bidding will be conducted through the international competitive procurement using Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers- Procur

Type
Prequalification
Tender
Sector
Civil Works & Roads
Procedure
Request for Bids
Classification
Not published at source

Update history (25)

Field-level amendments detected by TenderHive monitoring at each harvest of the source portal.

  1. worldbank1 field changed
    • Submission deadline

      02 Oct 2026

      02 Oct 2026

  2. worldbank0 fields changed
    • worldbank0 fields changed
      • worldbank0 fields changed
        • worldbank0 fields changed
          • worldbank0 fields changed
            • worldbank0 fields changed
              • worldbank0 fields changed
                • worldbank0 fields changed
                  • worldbank0 fields changed
                    • worldbank0 fields changed
                      • worldbank0 fields changed
                        • worldbank0 fields changed
                          • worldbank0 fields changed
                            • worldbank0 fields changed
                              • worldbank0 fields changed
                                • worldbank0 fields changed
                                  • worldbank0 fields changed
                                    • worldbank0 fields changed
                                      • worldbank0 fields changed
                                        • worldbank0 fields changed
                                          • worldbank0 fields changed
                                            • worldbank0 fields changed
                                              • worldbank0 fields changed
                                                • worldbank0 fields changed

                                                  Key dates

                                                  1. Published at source21 Aug 2026
                                                  2. Submission deadline02 Oct 2026