All tenders
PublicOpenWB-OP00460740Türkiye· Tender

Design, Supply and Installation of the Solar Power Plant (SPP) Project for Yeşilyurt Municipality, Malatya

Sign in to view the buyer

The buyer and the original notice are hidden. Create a free account to unlock them.Create free account
Estimated value
Not disclosed
Earliest action required
Checking…
Bid closes
08 Sept 2026
Submission method
Not stated at source

World Bank Procurement · published 05 Aug 2026 · last checked 05 Aug 2026 · 25 amendments recorded

Scope of works

Project P161915 — Sustainable Cities Project 2 · Method: Request for Bids · Civil works · HALEYE DAVET SÜRDÜRÜLEBLR EHRLER PROJES II – EK FNANSMAN YELYURT BELEDYES MALATYA YELYURT BELEDYES GÜNE ENERJS SANTRAL (GES) PROJES TASARIMI, TEDARK VE KURULUMU SÖZLEME NO. YESILYURT-W1_2 Ülke : Türkiye Proje Ad : Sürdürülebilir ehirler Projesi II – Ek Finansman Sözleme Bal : MALATYA YELYURT BELEDYES GÜNE ENERJS SANTRAL (GES) PROJES TASARIMI, TEDARK VE KURULUMU Kredi No . P170612 RFB Referans No. YESILYURT-W1_2 bu hale lan, Development Business'in dijital saysnda 14 Mart 2018 tarihinde yaymlanan WB2479-03/18 referans no’lu Genel Satnalma Bildirimini (GPN) takiben yaymlanmaktadr. ller Bankas A.. (bundan sonra "Kredi Salayc veya Ana Uygulayc veya LBANK" olarak anlacaktr), Dünya Bankas’ndan (IBRD) (bundan sonra "Ana Kreditör veya Banka veya IBRD" olarak anlacaktr) Sürdürülebilir ehirler Projesi II-Ek Finansman (P170612) (bundan sonra “SCP2-AF” olarak anlacaktr)- kapsamnda kullanlmak üzere kredi temin etmitir. ller Bankas A.. kredinin bir ksmn Yeilyurt Belediyesi (bundan sonra veren veya Yeilyurt Belediyesi olarak anlacaktr) MALATYA Yeilyurt Belediyesi Güne Enerjisi Santrali (GES) Projesi Tasarm, Tedariki ve Kurulumu (Sözleme No: YESILYURT- W1_2)” iinin finansman için tahsis etmitir. MALATYA Yeilyurt Belediyesi, MALATYA Yeilyurt Belediyesi Güne Enerjisi Santrali (GES) Projesi Tasarm, Tedariki ve Kurulumu i için Dünya Bankas satn alma esas ve usulleri dorultusunda, uygun teklif sahiplerini kapal zarf usulü teklif vermeye davet etmektedir. in kapsam; MALATYA Yeilyurt Belediyesi Güne Enerjisi Santrali (GES) Projesi Tasarm, Tedariki ve Kurulumu (990 kWe AC / 1.177,2 kWp DC kurulu güce sahip) Sözleme süresi, Kusur Sorumluluk Süresi hariç olmak üzere 152 (yüzelliiki) takvim günüdür. Kusur Sorumluluk süresi 365 (üçyüzaltmbe) gündür. hale, Dünya Bankas’nn “Yatrm Projeleri (IPF) Borçlular tarafndan uygulanacak Satnalma Kurallarna (Kasm 2020 revizyonu) uygun olacak ekilde T

Type
Invitation to bid / open tender
Tender
Sector
Healthcare & Medical
Procedure
Request for Bids
Classification
Not published at source

Source provenance (1)

Every portal notice that contributed to this record, with the values each one published. Where portals disagree, the originating notice is the published record.

Portal / referenceBuyerPublishedDeadlineValueMatch
worldbank
WB-OP00460740
Sign in to view the buyer05 Aug 202608 Sept 2026Published record

Update history (25)

Field-level amendments detected by TenderHive monitoring at each harvest of the source portal.

  1. worldbank0 fields changed
    • worldbank0 fields changed
      • worldbank0 fields changed
        • worldbank0 fields changed
          • worldbank0 fields changed
            • worldbank0 fields changed
              • worldbank0 fields changed
                • worldbank0 fields changed
                  • worldbank0 fields changed
                    • worldbank0 fields changed
                      • worldbank0 fields changed
                        • worldbank0 fields changed
                          • worldbank0 fields changed
                            • worldbank0 fields changed
                              • worldbank0 fields changed
                                • worldbank0 fields changed
                                  • worldbank0 fields changed
                                    • worldbank0 fields changed
                                      • worldbank0 fields changed
                                        • worldbank0 fields changed
                                          • worldbank0 fields changed
                                            • worldbank0 fields changed
                                              • worldbank0 fields changed
                                                • worldbank0 fields changed
                                                  • worldbank0 fields changed

                                                    Key dates

                                                    1. Published at source05 Aug 2026
                                                    2. Submission deadline08 Sept 2026