All tenders
PublicOpenWB-OP00459222Nepal· Expression Of Interest

Consulting Services for Detailed Structural Inspection and Preparation of Maintenance and Rehabilitation Requirements of Special Bridges

Sign in to view the buyer

The buyer and the original notice are hidden. Create a free account to unlock them.Create free account
Estimated value
Not disclosed
Earliest action required
Checking…
Bid closes
01 Sept 2026
Submission method
Not stated at source

World Bank Procurement · published 21 Aug 2026 · last checked 21 Aug 2026 · 25 amendments recorded

Assignment details for consultants

Only conditions published by the buyer are shown. Anything the source does not state is marked “Not stated” rather than assumed.

Individual consultant or consulting firm
Consulting firm
Notice classification
Required expertise
Civil Works & Roads
Notice category
Minimum qualifications
Not stated
Tender pack
Required years of experience
Not stated
Tender pack
Country or duty station
Nepal
Notice
Assignment duration
Not stated
Tender pack
Expected start date
Not stated
Tender pack
Submission method
Not stated
Tender pack
Required proposal documents
Not stated
Tender pack
Expression of interest requirements
Not an expression of interest notice
Notice
Mandatory registration
Not stated
Tender pack
Clarification deadline
Not stated
Tender pack
Submission deadline
01 Sept 2026
Notice

Classified as a consulting opportunity from the published procurement type, notice type, summary, title.

Scope of works

Project P507516 — Third Bridges Improvement and Maintenance Program · Method: Quality And Cost-Based Selection · Consulting services · REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS SELECTION) (Amended Notice) Amendment No. 3 NEPAL Third Bridges Improvement and Maintenance Program (BIMP-III) Loan No./Credit No./ Grant No.: IDA-Credit No. 7728-NP Assignment Title: Consulting services for detailed structural inspection and preparation of maintenance and rehabilitation requirements of special bridges 1. Karnali River Bridge, Chisapani, Karnali 2. Bheri River Bridge, Surkhet, Bheri 3. Trishuli (Mugling) River Bridge, Mugling, Chitwan 4. Marsyangdi River Bridge, Aanbukhaireni, Gorkha Reference No . (as per Procurement Plan): BIMPIII-DOR-CS-QCBS-013 The Government of Nepal has received financing from the World Bank toward the cost of the Third Bridges Improvement and Maintenance Program (BIMP-III), and intends to apply part of the proceeds for consulting services. The consulting services (“the Services”) include Detailed structural inspection and preparation of maintenance and rehabilitation requirements of special bridges. The detailed Terms of Reference (TOR) for the assignment can be found at the website of the Department of Roads www.dor.gov.np/home/notices. The Department of Roads, Bridge Branch, Third Bridges Improvement and Maintenance Program (BIMP III) now invites eligible consulting firms (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are: Core business and years in business General Experience of Firm within last 15 years. Relevant experience of the Consulting Firm with similarity in nature, size, complexity within last 10 years. Technical, Managerial and organizational capability of the firm (Professional staff relevant to the assignment) (Note- Consultants shall mention the work experience indicating duration of the assignment, commencement and completion year. The consultant shall mention detailed features of the bridge.) Key Experts will not be evaluated at the shortlisting stage. The attention of interested Consultants is drawn to Sectio

Type
Expression of interest
Expression Of Interest
Sector
Civil Works & Roads
Procedure
Quality And Cost-Based Selection
Classification
Not published at source

Update history (25)

Field-level amendments detected by TenderHive monitoring at each harvest of the source portal.

  1. worldbank1 field changed
    • Status

      closed

      closing_soon

  2. worldbank1 field changed
    • Status

      closing_soon

      closed

  3. worldbank1 field changed
    • Submission deadline

      01 Sept 2026

      01 Sept 2026

  4. worldbank0 fields changed
    • worldbank0 fields changed
      • worldbank0 fields changed
        • worldbank0 fields changed
          • worldbank0 fields changed
            • worldbank0 fields changed
              • worldbank0 fields changed
                • worldbank0 fields changed
                  • worldbank0 fields changed
                    • worldbank0 fields changed
                      • worldbank0 fields changed
                        • worldbank0 fields changed
                          • worldbank0 fields changed
                            • worldbank0 fields changed
                              • worldbank0 fields changed
                                • worldbank0 fields changed
                                  • worldbank0 fields changed
                                    • worldbank0 fields changed
                                      • worldbank0 fields changed
                                        • worldbank0 fields changed
                                          • worldbank0 fields changed
                                            • worldbank0 fields changed

                                              Key dates

                                              1. Published at source21 Aug 2026
                                              2. Submission deadline01 Sept 2026