All tenders

Conversion & Commercial Fit-Out of 90 Hermon Hill E18 to 105-Place Nursery - HW/4699

Ref ocds-b5fd17-59f692e6-4a6c-474a-be3f-1fb19aa772f1Advertised19 Nov 2026Closing 01 Dec 2026

Tender Description

Happywoods Nursery is seeking an experienced commercial main contractor to undertake the full internal conversion, refurbishment, and fit-out of 90 Hermon Hill, South Woodford, London, E18 1QB, converting a vacant former care home into a 105-place children's day nursery with top-floor administrative offices. Scope & Design Specification Summary (per Dovetail Architects Design Brief Rev 0 & Drawings PL-100 to PL-122): - Classrooms (Babies, Toddlers & 3-5 Years): Forbo welded non-slip vinyl with matching cap & cove; 3mm plaster skim with Dulux Matt Emulsion; Rockfon Blanka dB35 suspended ceilings (600x600mm grid); veneered fire doors with vision panels, finger guards, closers/back-checks & kick plates; adult/child-height handleless base units, 28mm square-edge worktops (mason's mitre), 400mm WhiteRoc splashbacks & SS 1.5 bowl sinks. - WCs & Nappy Change: Forbo welded vinyl; 1200mm WhiteRoc wall panelling; 18mm HPL IPS enclosures & 1100mm cubicles; Armitage Shanks Contour 21 Splash WCs (305/355mm); Franke Wave trough sinks with Avon 21 self-closing taps; Concept Arc 55cm basins; full DDA sanitary packs. - First Floor Commercial Kitchen & Laundry: Full-height WhiteRoc wall panelling; handleless units; min. 2 sinks plus hand-rinse basin; 304 food-grade fully welded SS extraction canopy with baffle filters, LED lights & speed-controlled fan; dedicated AC heating/cooling. - Stair Cores, Offices & Staff Room: Forbo carpet tiles with 150x18mm single-groove MDF skirting; contrasting stair nosings; dual-height brushed 304 SS handrails; 10mm toughened clear glass balustrades; perimeter dado trunking at 850mm FFL; staff kitchenette with microwave housing & 400mm WhiteRoc splashback. - MEP & Security: Central boiler serving Low Surface Temperature (LST) radiators throughout, supplemented by air conditioning units in classrooms, offices & kitchen/laundry; L1 fire alarm & secure video intercom. - Acoustic & External Works (per Clear Acoustic Design Report CAD-26116): Continuous 2.0m absorptive acoustic timber boundary fencing (Jackson's Jakoustic or approved equal, min. 15 kg/m2 surface mass with sealed base junctions); acoustic sealing/lining to party wall adjoining 92 Hermon Hill; Falcon Way drop-off & external play surfacing. Contract & Site Terms: - Form of Contract: JCT Intermediate Building Contract with Contractor's Design (ICD) or JCT Minor Works with Contractor's Design. - Site Possession & DBS Exemption: The property is vacant and unoccupied; full site possession transfers to the Principal Contractor under CDM 2015. Because no children are on site during works, Enhanced DBS clearance is NOT required. Additional information: Site Access, Logistics & Key Notes for Tendering Contractors: Accompanied Site Visits: Site inspections at 90 Hermon Hill (E18 1QB) are strictly by prior appointment during the tender period. Contractors are strongly encouraged to inspect existing M&E incoming capacities, structural layouts, party-wall conditions, and external garden levels prior to submitting pricing. Traffic, Deliveries & Neighbour Amenity: The site sits at the junction of Hermon Hill and Falcon Way, directly adjoining residential properties (including 92 Hermon Hill and Osprey Close). Contractors must factor in a practical Traffic & Logistics Management Plan covering material deliveries, skip positioning, and strict adherence to London Borough of Redbridge permitted construction working hours. Design Brief & Acoustic Compliance: Tenderers must price strictly in accordance with the attached HappyWoods Design Brief (June 2026, Rev 0) and Clear Acoustic Design Noise Impact Assessment (CAD-26116)-specifically the continuous 2.0m absorptive acoustic timber fencing (minimum 15 kg/m² surface mass with sealed base junctions) and party-wall soundproofing specifications. Unoccupied Site / DBS Exemption: The buildi

Country
United Kingdom
Published
19 Nov 2026
Closing date
01 Dec 2026
Classification
CPV 45211350 · Multi-functional buildings construction work
CPV 45214000 · Construction work for buildings relating to education and research
CPV 45214100 · Construction work for kindergarten buildings
CPV 45210000 · Building construction work
CPV 45453100 · Refurbishment work
CPV 45213100 · Construction work for commercial buildings
CPV 45000000 · Construction work
CPV 45453000 · Overhaul and refurbishment work
CPV 45214200 · Construction work for school buildings
Predictive Analytics
Notice sources

Source provenance (2)

Every portal notice that contributed to this record, with the values each one published. Where portals disagree, the originating notice is the published record.

Portal / referenceBuyerPublishedDeadlineValueMatch
uk_contracts_finder
ocds-b5fd17-59f692e6-4a6c-474a-be3f-1fb19aa772f1
Sign in to view the buyer19 Nov 202601 Dec 2026GBP 500,000Published record
uk_contracts_finder
ocds-b5fd17-4bdc69b9-a8ad-4745-9a37-d89e01856ea0
Sign in to view the buyer18 Nov 202601 Dec 2026GBP 500,000Matched on title, buyer and country