Tender Description
Project P179684 — Sustainable Power and Irrigation for Nigeria Project · Method: Request for Proposals · Civil works · Invitation for Initial Selection Works (Design and Build) Employer: Federal Ministry of Water Resources & Sanitation Project: Sustainable Power and Irrigation for Nigeria (SPIN) Project Contract title: Rehabilitation and Modernization of Irrigation Schemes: Lot 1: Doma Irrigation Scheme (Nasarawa State) and Galala Irrigation Scheme (Bauchi State); Lot 2: Kampe-Omi Irrigation Scheme (Kogi State) and Duku-Lade Irrigation Scheme (Kwara State); and Lot 3: Adani Irrigation Scheme (Enugu State) and Ndi-Eze Irrigation Scheme (Ebonyi State). Country: Nigeria Credit No.: 76370NG ISD No: FMWR&S/SPIN/D&B/RFP/2026/31 Issued on: November 10, 2026 1. The Federal Government of Nigeria has received financing from the World Bank toward the cost of the Sustainable Power and Irrigation for Nigeria (SPIN) Project and intends to apply part of the proceeds toward payments under the contracts for Rehabilitation and Modernization of Irrigation Schemes: Lot 1: Doma Irrigation Scheme (Nasarawa State) and Galala Irrigation Scheme (Bauchi State); Lot 2: Kampe-Omi Irrigation Scheme (Kogi State) and Duku-Lade Irrigation Scheme (Kwara State); and Lot 3: Adani Irrigation Scheme (Enugu State) and Ndi-Eze Irrigation Scheme (Ebonyi State). 2. The Federal Ministry of Water Resources & Sanitation, through the Federal Project Management Unit (FPMU) of the SPIN Project, intends to initially select Applicants for the Procurement of works (Design and Build), summarized below: a) Scope: Design review/upgrade (surveys, investigations and a modernised final design, including provision for Farmer-Led Irrigation Development) and rehabilitation/construction of intakes, lined canals, hydraulic and drainage structures and access roads, etc through to commissioning and handover. Modernisation includes replacing unlined channels with lined canals or piped/pressurized networks where feasible, improved water control and measurement structures, and innovations that improve scheme performance. Full details of the scope of works are provided in the Initial Selection Document (ISD). (b) Performance: The works shall achieve high overall irrigation efficiency from source to field. This includes conveyance efficiency abo
- Country
- Nigeria
- Published
- 10 Nov 2026
- Closing date
- 22 Dec 2026
- Procedure
- Request for Proposals
- Lot
- LOT-1
