All tenders

Review and Updating of Feasibility Studies, Technical Assessments and Detailed Engineering Design for Irrigation Schemes

Ref WB-OP00478016Advertised07 Nov 2026Closing 16 Nov 2026

Tender Description

Project P515925 — GFPP to Support Preparation of Competitive, Resilient Agriculture and Irrigation Services (CRAIS) in · Method: Consultant Qualification Selection · Consulting services · ADDENDUM No 1 TO THE REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS SELECTION) The Republic of Azerbaijan Project Preparation in relation to: Competitive and Resilient Agriculture and Irrigation Services (CRAIS) Project Loan/Grant No.: TF0D1739 Assignment Title: Review and Updating of Feasibility Studies, Technical Assessments and Detailed Engineering Design for Irrigation Schemes Reference No.: CRAIS-P515925-CS-CQS/1 CLARIFICATION RESPONSES REGARDING THE TERMS OF REFERENCE The following clarifications are provided to ensure a common understanding among all prospective consultants of the scope of the assignment. As set out in the Terms of Reference (TOR), the assignment is structured in three phases: Phase 1 covers review of existing studies, feasibility studies, technical-economic assessments, conceptual designs, hydraulic data, operational records, and intensive technical consultations with ASWRA, irrigation institutions, local stakeholders, and relevant government entities regarding rehabilitation and modernization priorities for the irrigation schemes under Component 1 validating the viability and readiness of the irrigation schemes for World Bank financing, and identifying the needs and scope for updating existing documentation. Phase 2 covers the preparation or updating of the necessary technical and economic assessments and feasibility studies for all viable sub-projects identified under Phase 1. The selected priority sub-project will be addressed as a priority to inform the subsequent detailed design work. The feasibility-level work for the remaining viable schemes should provide the necessary inputs for CRAIS project appraisal. Phase 3 is limited to the selected priority sub-project and covers the detailed engineering design and preparation or updating of the technical documentation required to bring that sub-project to full procurement and implementation readiness. Accordingly, the clarifications below should be read together with the TOR and do not amend the scope of the assignment. No. Question / Issue Raised Clarification 1.1 Is it intended to assess the existing technical documentation for all four projects against the requi

Country
Azerbaijan
Published
07 Nov 2026
Closing date
16 Nov 2026
Procedure
Consultant Qualification Selection
Predictive Analytics
Notice sources
Tender updates

Update history (25)

Field-level amendments detected by TenderHive monitoring at each harvest of the source portal.

  1. worldbank1 field changed
    • Status

      closed

      closing_soon

  2. worldbank1 field changed
    • Status

      closed

      closing_soon

  3. worldbank1 field changed
    • Status

      closed

      closing_soon

  4. worldbank1 field changed
    • Status

      closed

      closing_soon

  5. worldbank1 field changed
    • Status

      closed

      closing_soon

  6. worldbank1 field changed
    • Status

      closed

      closing_soon

  7. worldbank1 field changed
    • Status

      closed

      closing_soon

  8. worldbank1 field changed
    • Status

      closed

      closing_soon

  9. worldbank1 field changed
    • Status

      closed

      closing_soon

  10. worldbank1 field changed
    • Status

      closed

      closing_soon

  11. worldbank1 field changed
    • Status

      closed

      closing_soon

  12. worldbank1 field changed
    • Status

      closed

      closing_soon

  13. worldbank1 field changed
    • Status

      closed

      closing_soon

  14. worldbank1 field changed
    • Status

      closed

      closing_soon

  15. worldbank1 field changed
    • Status

      closed

      closing_soon

  16. worldbank1 field changed
    • Status

      closed

      closing_soon

  17. worldbank1 field changed
    • Status

      closed

      closing_soon

  18. worldbank1 field changed
    • Status

      closed

      closing_soon

  19. worldbank1 field changed
    • Status

      closed

      closing_soon

  20. worldbank1 field changed
    • Status

      closed

      closing_soon

  21. worldbank1 field changed
    • Status

      closed

      closing_soon

  22. worldbank1 field changed
    • Status

      closed

      closing_soon

  23. worldbank1 field changed
    • Status

      closed

      closing_soon

  24. worldbank1 field changed
    • Status

      closed

      closing_soon

  25. worldbank1 field changed
    • Status

      closed

      closing_soon