All tenders

Consultancy Services for Feasibility Study and Detailed Design of Irrigation Schemes in Four Woredas: Golitseha Drip Irrigation, Hobi Gravity Irrigation, Testura Gravity Irrigation, and Undulu Woreda Sprinkler Irrigation

Ref WB-OP00473995Advertised08 Oct 2026Closing 22 Oct 2026

Tender Description

Project P180076 — Lowlands Livelihood Resilience Project, Phase Two (LLRP II) · Method: Quality And Cost-Based Selection · Consulting services · REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES– FIRMS SELECTION) COUNTRY: [Ethiopia] NAME OF PROJECT: [Benishangul gumuz regional state, Lowlands Livelihood Resilience Project (LLRP-II)] Loan No: [IDA- 75190] Assignment Title: Consultancy Services for Planning, Feasibility Study, Environmental and Social Impact Assessment, Detailed Engineering Design, Preparation of Tender Documents and Construction Readiness Packages for Climate-Resilient Irrigation and Drainage in four woredas of the region. Reference No . ET-BEN-GUM-RPCU-569758-CS-QCBS The [ Government of Ethiopia has received to apply for financing from the World Bank toward the cost of the [Consultancy Services for Planning, Feasibility Study, Environmental and Social Impact Assessment, Detailed Engineering Design, Preparation of Tender Documents and Construction Readiness Packages for Climate-Resilient Irrigation and Drainage], and intends to apply part of the proceeds for consulting services. The consulting service (“the Services”) includes listed expected outputs of the studies: Outputs of study Assignment Planning and Feasibility Study Environmental and Social Impact Assessment Detailed Engineering Design Preparation of Tender Documents and Construction Readiness Packages for Climate-Resilient Irrigation and Drainage in four selected woredas of the region. Project information No Region Zone Woreda Kebele Estimated Command Area (ha) Proposed Scheme Type Proposed Water Source 1 B/Gumuz Asosa Abramo Golitseha 150 Drip Irrigation Surface Water 2 B/Gumuz Asosa Undulu Undulu 150 Sprinkler Irrigation Surface Water 3 B/Gumuz Asosa Buldigilu Hobi 200 Diversion Scheme Surface Water 4 B/Gumuz Asosa Mao-komo Tsotsora 150 Diversion Scheme Surface Water Estimated level of effort (professional staff-months), implementation period 4 (four) calendar month from contract signing. Expected start date of assignment will be within 7 days from contract signing ensuring full consistency with the TOR referred to in this REOI. The detailed Terms of Reference (TOR) for each assignment can be obtained at the address given below. The Benishangul gumuz regional state, Lowlands Livelihood Resilience Projec

Country
Ethiopia
Published
08 Oct 2026
Closing date
22 Oct 2026
Procedure
Quality And Cost-Based Selection
Predictive Analytics
Notice sources