Tender Description
Project P500488 — Climate Resilient Roads for the North Project · Method: Quality And Cost-Based Selection · Consulting services · REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES - FIRMS SELECTION) Country: Mozambique Name of Project: Climate Resilient Roads for the North (CRRN - P500488) Grant No.: E315-MZ Assignment Title: Consultancy Services for Preparation of Feasibility Study, Conceptual Design, Environmental and Social Impact Assessment and Bidding Documents for Civil Works under Design and Build Methodology for the Road R689 Angoche – Monapo (160 km) in Nampula Province. . Reference No: 47A003041/CP/29/2026 Client: National Roads Administration , Administração Nacional de Estradas (ANE) , IP 1. The Government of Mozambique (GoM) has received financing from the World Bank towards the cost of the Climate Resilient Roads for the North (CRRN), and intends to apply part of the proceeds for Consultancy Services for Preparation of Feasibility Study, Conceptual Design and Environmental and Social Impact Assessment (ESIA) for Civil Works under Design and Build Methodology for the Road R689 Angoche – Monapo (160 km) in Nampula Province hereafter designated the “Services”. 2. The consulting services (“the Services”) include but not limited to the following: Prepare the feasibility study and carry out an economic viability study based on international standards. Conduct a climate vulnerability risk assessment to identify and evaluate the effects of climate change along the above-mentioned road and recommend climate adaptation measures to increase its resilience, using Intergovernmental Panel on Climate Change, climate projections and work with local meteorological agencies to model future flood risks under different emission scenarios. Carry out a road safety assessment for identification of existing high-risk sections along the roads. Prepare conceptual designs, financial models/payment schedules for the works and a confidential price estimate for civil works contracts. Prepare the ESIA for the road projects sites to ensure the project design incorporates the mitigation measures for the potential negative impacts and maximizes the positive impacts of the project in a manner consistent with all applicable requirements of the World Bank
- Country
- Mozambique
- Published
- 13 Aug 2026
- Closing date
- 09 Sept 2026
- Procedure
- Quality And Cost-Based Selection
