All tenders

Monitoring of Output and Performance Based Road Contract (OPBRC) in N1 Corridor between Gorongosa and Caia, Lot 1 (km0 - km84) in Sofala Province

Ref WB-OP00457998Advertised22 Jul 2026Closing 19 Aug 2026

Tender Description

Project P174639 — Mozambique Safer Roads for Socio-Economic Integration Program · Method: Quality And Cost-Based Selection · Consulting services · Republic of Mozambique NATIONAL ROADS ADMINISTRATION, IP General Director Office REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES - FIRMS SELECTION) Name of Project: Mozambique Safer Roads for Socio-Economic Integration Program (P174639) Grant No.: E078-MZ Assignment Title: Consultancy Services for Monitoring of Output and Performance Based Road Contract (OPBRC) in N1 Corridor Gorongosa - Caia Lot 1 (km 0 to km 84) in Sofala Province Reference No: 47A003041/CP/55/2026 Client: Administração Nacional de Estradas, I.P. 1. The Government of Mozambique (GOM) has received financing from the World Bank toward the cost of the Safer Roads for Socio-Economic Integration Program and intends to apply part of the proceeds towards the payment for Consultancy Services for Monitoring of Output and Performance Based Road Contract (OPBRC) in N1 Corridor Gorongosa - Caia Lot 1 (km 0 to km 84) in Sofala Province. 2. The key objective of the consultancy services is to assist ANE in the upgrading of the N1 road infrastructure to climate resilient standards and build a safer transport corridor by monitoring the Contractor’s performance and compliance with all contractual requirements, and by providing implementation support to the Employer during the implementation of the Project, including ensuring full compliance with the Environmental and Social measures as required by GOM and the World Bank, during the following phases: Phase 1 – when the Contractor mobilizes, prepares its detailed designs and then carries out all Rehabilitation and Improvement/ upgrading works, and at the same time provides maintenance services to guarantee a certain minimum service level; and Phase 2 – when the Contractor maintains the already Rehabilitated and Improved/ upgraded road sections at a normal service level and carries out periodic maintenance before close of the OPBRC contract. 3. Terms of Reference (ToR) can be obtained at the address below; however, these ToR will undergo changes and the final version will be in the RFP. 4. GOM represented by the National Roads Administration (ANE) now invites eligible consulting firms (“Consultants”) to express

Country
Mozambique
Published
22 Jul 2026
Closing date
19 Aug 2026
Procedure
Quality And Cost-Based Selection
Lot
LOT-1
Predictive Analytics
Notice sources