Tender Description
Project P507316 — Saint Vincent and the Grenadines: Beryl Emergency Resilient Recovery Project · Method: Request for Bids · Civil works · Specific Procurement Notice Request for Bids Small Works (Two-Envelope Bidding Process) Employer: The Government of St. Vincent and the Grenadines c/o Ministry of Finance, Economic Planning and Information Technology Project: Beryl Emergency Resilient Recovery Project Contract title: Construction of a permanent bridge at Noel Country: Saint Vincent and the Grenadines Loan No. /Credit No. / Grant No.: IDA-76430 RFB No: SVG-BERRY-W-RFB-01 Issued on: October 20, 2025 1. The Government of Saint Vincent and the Grenadines (hereinafter called “Borrower”) has received financing from the World Bank toward the cost of the Beryl Emergency Resilient Recovery Project (BERRy) and intends to apply part of the proceeds toward payments under the contract for Construction of a permanent bridge Noel. The Ministry of Finance, Economic Planning and Information Technology (hereinafter called “MFEPIT”), an implementing agency of the Borrower now invites sealed Bids from eligible Bidders for the Construction of a permanent bridge at Noel. The proposed bridge comprises two spans, with the northern section of the bridge having a span of 30.0m, and the southern section of the bridge having a span of 17.0m. The minimum clear depth to the riverbed is 4.7m. The superstructure comprises 6 No. 16.520m long precast prestressed reinforced concrete AASHTO III beams on the southern span, with 6 No. 29.520m long precast prestressed reinforced concrete AASHTO IV beams on the northern span. The bridge has a 250mm thick reinforced concrete structural deck. The deck slab and beams are supported on reinforced concrete abutment walls approximately 5m in height and a central pier approximately 6.6m in height. Wingwalls are also of reinforced concrete construction. The entire structure will be supported on reinforced concrete spread footings which are located approximately 1.0m below the river bed. In cross-section, the proposed road width over the new bridge is 7.60m wide with a 1.5m wide sidewalk on both sides. Reinforced concrete parapet walls are included at the sides of the sidewalk to provide protection for pedestrians. The foundations to the northern abutment, northern wingw
- Country
- St. Vincent & Grenadines
- Published
- 21 Oct 2025
- Closing date
- 10 Dec 2025
- Procedure
- Request for Bids
