All tenders

Construction of a permanent bridge at Overland

Ref WB-OP00402400Advertised20 Oct 2025Closing 10 Dec 2025

Tender Description

Project P507316 — Saint Vincent and the Grenadines: Beryl Emergency Resilient Recovery Project · Method: Request for Bids · Civil works · Specific Procurement Notice Request for Bids Small Works (Two-Envelope Bidding Process) Employer: The Government of St. Vincent and the Grenadines c/o Ministry of Finance, Economic Planning and Information Technology Project: Beryl Emergency Resilient Recovery Project (BERRy) Contract title: Construction of a permanent bridge at Overland Country: Saint Vincent and the Grenadines Loan No. /Credit No. / Grant No.: IDA-76430 RFB No: SVG-BERRY-W-RFB-02 Issued on: October 20, 2025 The Government of Saint Vincent and the Grenadines (hereinafter called “Borrower”) has received financing from the World Bank toward the cost of the Beryl Emergency Resilient Recovery Project (BERRy) and intends to apply part of the proceeds toward payments under the contract for Construction of a permanent bridge at Overland The Ministry of Finance, Economic Planning and Information Technology (hereinafter called “MFEPIT”), an implementing agency of the Borrower now invites sealed Bids from eligible Bidders for the Construction of a permanent bridge at Overland. The proposed bridge has a clear span of 23 m with a minimum clear depth to the riverbed of 4.4m. The superstructure comprises 7 No. 23.8m long precast prestressed reinforced concrete AASHTO III beams with a 250mm thick reinforced concrete structural deck. The deck slab and beams are supported on reinforced concrete abutment walls approximately 4.4m in height. Wingwalls are also reinforced concrete construction. The entire structure will be supported on reinforced concrete spread footings which are located approximately 1.0m below the river bed. In cross-section, the proposed road width over the new bridge is 7.60m wide with a 1.5m wide sidewalk on both sides. Reinforced parapet walls are included at the sides of the sidewalk to provide protection for pedestrians. There will be reinforced concrete wingwalls supported on spread footings protected by dumped rip rap 1m thick surrounding both abutments and wingwalls. It is proposed to construct the new bridge to the west of and upstream of the fording with the existing road and bailey bridge crossing still functioning during the construction of the new bridge and

Country
St. Vincent & Grenadines
Published
20 Oct 2025
Closing date
10 Dec 2025
Procedure
Request for Bids
Predictive Analytics
Notice sources