All tenders

Small Works: The construction of water reservoirs, reservoir measures and the construction of administration and electrical buildings for CWSA

Ref WB-OP00363585Advertised12 Jun 2025Closing 25 Jul 2025

Tender Description

Project P176943 — Saint Vincent and the Grenadines Volcanic Eruption Emergency Project · Method: Request for Bids · Civil works · Specific Procurement Notice Request for Bids Small Works (One-Envelope Bidding Process) Country: Saint Vincent and the Grenadines Name of Project: Volcanic Eruption Emergency Project Contract Title: Small Works: The construction of water reservoirs, reservoir measures and the construction of administration and electrical buildings for CWSA (Lot 3) Loan No./Credit No./ Grant No.: IDA-70060 RFB Reference No.: SVG-VEEP-W-RFB-7 The Government of Saint Vincent and the Grenadines (hereinafter called “Borrower”) has received financing from the World Bank toward the cost of the Volcanic Eruption Emergency Project (VEEP) and intends to apply part of the proceeds toward payments under the contract for Small Works: The construction of water reservoirs, reservoir measures and the construction of administration and electrical buildings for CWSA (Lot 3) . The Ministry of Finance, Economic Planning and Information Technology (hereinafter called “MFEPIT”), an implementing agency of the Borrower now invites sealed Bids from eligible Bidders for the Small Works: The construction of water reservoirs, reservoir measures and the construction of administration and electrical buildings for CWSA (Lot 3). The two reservoirs will have a storage volume of 236,000 Ig at Overland and 40,000 Ig at Point Village, will be in concrete material and fitted with inlet, outlet, overflow, washout and ventilation pipes and valves, as well as field instruments (electromagnetic outlet flowmeter and ultrasonic level meter), electric panel and solar PV power supply. The rehabilitation measures at the existing water reservoirs of Sandy Bay and Sion Hill will consist mainly of works at the existing inlet and outlet of the reservoirs. The administration building construction, with an approximate floor area of 102m2, will be fitted with a control room, warehouse, office and water operator facilities. The electrical building, with an approximate surface of 65m2, will house the electrical equipment and an emergency diesel generator. The estimated duration of the works is 14 months. Bidding will be conducted through international competitive procurement using a Request for Bids (RFB) as

Country
St. Vincent & Grenadines
Published
12 Jun 2025
Closing date
25 Jul 2025
Procedure
Request for Bids
Predictive Analytics
Notice sources