Removing silt and necessary repairs to the Toe Drain, Cross Drain, and Collection Drain of the earthen dam and installing V-Notches to measure seepage in various parts of the dam of Gosikhurd Project
Ref IN-2026_CEWRD_1349746_10Advertised02 Nov 2026Closing 12 Nov 2026