All tenders

Forestry and Parks - Request for Quotes - PIGEON LAKE PP FIREWOOD STORAGE SHED REPLACEMENT

Ref AB-2026-07074Advertised22 Oct 2026Closing 03 Nov 2026

Tender Description

SCOPE OF WORK: • Mobilization and Demobilization of all equipment. • Complete First Call and secondary line locates as needed. • Erect signage for public acknowledgement of construction in progress. • Remove existing 20’L X 19’D X 9’T woodshed and dispose of off site. • Remove vegetation and prep site for new 26’ L X 16’ D woodshed. • Supply and haul onto site all materials for construction of a new 26’ L X 16’ D lean-to firewood storage shed (14’T walls at front of shed and 10’ T walls at rear of shed) with a compacted 3/4-inch road crush pad inside woodshed. • Wall framing for the new shed is to be 2” X 6” dimensional lumber and LVL headers where needed. Wall framing to be placed at 24” o/c and on 6” X 6” pressure treated sleepers placed flush with grade under all four walls. • Exterior wall finishing of the shed to be 1/2” pressure treated plywood on the bottom course and 7/16” OSB from 4’ above grade to top of walls. • Exterior of the shed is to be wrapped with a Water Resistive Barrier (WRB’s) such as Tyvek® HomeWrap® or equivalent product with approval of the project manager. • Front openings to be framed in to provide shed with two 8’ height openings with 8” X 8” pressure treated centre support post for header. • Interior rear and side walls to have six courses of 2” X 6” dimension lumber added to prevent damage when receiving firewood deliveries. • Lockable gates to be welded double swing (2 Sets) 8’ T - 1 5/8” frame c/w 9 ga chain link mesh to fit two approximate 12’ wide openings. • Roof framing to be 2” X 8” dimensional lumber 24” o/c and 2” X 8” rough fascia with 4” overhangs on all sides and 1” X 4” dimensional lumber strapping placed perpendicularly at roughly 30” o/c. • Roofing materials to be 26ga metal roofing Westform Metals WF-12-36® and all associated flashings and materials, (Metro Brown in color) or equivalent product with approval of the project manager. No soffit, fascia, eavestroughs or downspouts are needed. • 3 solar powered motion activated lights. 2 lights to be mounted on the interior side walls with light directed to the back wall and 1 light to be mounted on the exterior in the middle of the front wall above the chain link gates. • Clean up of site and removal of all debris created during removal of existing firewood shed and construction of new firewood shed. Clean up of site is required and debris is to be disposed of offsite, and not in parks refuse containers.

Country
Canada
Published
22 Oct 2026
Closing date
03 Nov 2026
Procedure
OPEN-COMPETITIVE
CPV code
72000000
Predictive Analytics